0
exhaust silencer baffles
exhaust silencer baffles
exhaust silencer baffles
exhaust silencer baffles
exhaust silencer baffles

Tank 21757131 Cooling System Spare Parts Generator Engine Parts Mall

21757131
minimum order
1 carton
Quantity
$6000.00 - $6500.00 / carton
Contact Now
add to cart
  • Application:diesel generator, gasoline generator
  • Place of Origin:Fujian, China
  • Brand Name:NO
  • Model Number:21757131
  • rated current:NO
  • Type:diesel engine part
  • generator type:diesel generator, gasoline generator
  • Product Name:21757131
  • Warranty:NONE
  • Stock:In Stock
  • Color:Optional
  • Material:nylon cold rolled steel plate
  • Keyword:emergency switch
  • Size:pictures below detail
  • Quality:High Performance
  • Packing:carton
  • WEIGHT:0.15kg

Product Description
Tank 21757131 Cooling System spare parts Generator engine parts Mallgenerator sets
 
Product Technical Data
Material
Stainless steel
Colour:
Black
With Rubber Gasket
Yes
MOQ:
1 pcs
Samples:
Supplied
Delivery Time:
Around 3 work days after receipt of payment
 
 
 
 
 
Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
 
FAQ
 
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000

For More details,can send us inqury to know Factory Pirce!