0
Gasoline Generator Spare Parts Avr
Gasoline Generator Spare Parts Avr
Gasoline Generator Spare Parts Avr
Gasoline Generator Spare Parts Avr
Gasoline Generator Spare Parts Avr

Inexpensive Three Phase Gasoline Generator Spare Parts Avr 5kw Automatic Voltage Regulator Genset 5kva Avr with Heat Sink

5kw
minimum order
1 carton
Quantity
$2.50 - $5.00 / carton
Contact Now
add to cart
Inexpensive Three Phase Gasoline Generator Spare Parts Avr 5kw Automatic Voltage Regulator Genset 5kva Avr with Heat Sink
  • Model Number:5kw
  • Type:AVR
  • Product Name:Guangling
  • Package Size:13.5*10*6CM
  • Weight:0.35kgs
  • Application Range:brushless generator set
  • Output Voltage:90V DC Maximum
  • Input Voltage:Max.90VDC-240VAC input
  • Regulation:±1%
  • Output Current:4A
  • Input Frequency:50/60Hz
  • Appearance:neutral
PRODUCT SPECIFICATIONS
 
Item Name
General machine regulator
Function
Regulate the voltage of big output power general machine.
Appearance
Wire: Eight.
Plug: Two.
Pin: Eight.
Install hole: Two.Wire length: Customized.
Application
5KW general machine engines
Certification
CE,ISO
Warranty
1 year
MOQ
Please inquire stock.
Port
fuzhou etc
 
 
 
 
 
 
 
Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
 
FAQ
 
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is
longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms
or west union.
Q6: What is your company's available production capacity?
A:1000 000000

For More details,can send us inqury to know Factory Pirce!