0
110v speed controller
110v speed controller
110v speed controller
110v speed controller
110v speed controller

Generator Controller Panel Eg3002 Control Board diesel Petrol Genset Parts

EG3002
minimum order
1 carton
Quantity
$30.00 - $45.00 / carton
Contact Now
add to cart
  • Application:engine parts
  • Place of Origin:Fujian, China
  • Brand Name:NO
  • Model Number:EG3002
  • Type:Control Panel
  • generator type:diesel generator, gasoline generator
  • Function::12V/24V
  • Quality Class::Governor speed control
  • keywords:EG3002
  • Packing:Carton packing
  • Guarantee:1year
  • Operation Humidity:Max 95%
  • Speed Rangs:1khz~7.5khz
  • Single packing size:18*17.5*5cm
  • Operation Temp:-40~+80℃

Product Description

generator controller panel eg3002 control board diesel petrol genset parts
 
 
Generator Electronic Governor EG3002 Speed Control Unit
Speed Sensor Signal
0.5-120V RMS
Speed range
1Khz ~ 7.5Khz
Temperature Range
-40~85C
Working Voltage
12-32V
Voltage
12V DC 24V DC
Output
50mA
Signal of speed sensor
0.5 ~ 120V RMS
 
 
 
 
 
 
 
 
 
Our Services
Guangling strictly adopt the international warranty.
Warranty: Guarantee for one year or 1000 running hours (accord to whichever reach first) from shipment date.
During the guarantee period, guangling will provide the free easy-damaged spare parts for problems caused
by our quality of production or raw material, except the damageable spare parts caused by customer's incorrect man-
made operation.
After expiration, Guangling provides cost spare-parts maintenance for gensets .
 
FAQ
 
Q1: What is your MOQ of this item?
A: 1 pcs
Q2: What is the lead time?
A:2days after receiving your L/C or TT deposit.But if your order is some special engine and alternator, then the delivery time is longer.
Q3: Is it able to make customer's own brand name?
A: We can be your OEM manufacture with your authorization of brand.
Q4: Where is your Loading Port?
A: Any port in China. Usually Fuzhou port.
Q5: What is your payment term?
A: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms or west union.
Q6: What is your company's available production capacity?
A:1000 000000

For More details,can send us inqury to know Factory Pirce!